Bike
Path Option 1
(page 4 of the study)
The
first design option (as shown in Figure 1.0) is located completely to the east of the Tierrasanta Boulevard right-of-way.
The overall length of the path north of the San Diego River is
4.400 linear feet, and will require
19 acres of right-of-way acquisition. The entire path is located within
land owned by J.J.B. Land Company. (Editor
Note: Figure 1a is the contractor sketch of option 1) |