|
|
Traffic Study
Requested by the TCC from Intracorp Developer This page provides the summary information derived from the the analysis conducted by Rick Engineering (which contracts with the City of San Diego for up to 1/2 their jobs). These pages were copied from a graphic version (not text version of a PDF file) so the clarity of the pages is not good. The study was expanded from that requested by the TCC, with no notice given to the TCC, to assume that Santo Road Santo Road has been connected to Friars Road through the La Mirage Apartments for both the existing Tierrasanta Boulevard analysis and the year 2030 analysis. So Santo Road (assumed to be connected to Friars Road) shows to alleviate some traffic impact on Tierrasanta Boulevard for the current 2005 traffic and for the 2030 traffic. A comparison of the current traffic on Tierrasanta Boulevard between the Navy Housing project traffic study conducted in 2003 (average daily traffic of and the Rick Engineering study) shows a rough increase of at least 3000 trips per day can be added to the Tierrasanta Boulevard high impact figures:
|