A number of streets in the Tierrasanta area are scheduled for slurry sealing or AC Paving this fall and winter. By date range, they are as follows: AC1512 AC PAVING 9/1/16 thru 1/1/17 AC1601 AC PAVING 11/15/16 thru 4/15/17 --Slurry Schedule AC1601 AC PAVING 11/15/16 thru 4/15/17--AC Paving...
Read more